All Impact Stories
Furnace Revamp — TATA SSL, Boisar

25% More Output.

36 → 42–45 tons/hr. A complete furnace revamp at TATA SSL, Boisar lifted production throughput while reducing both fuel and power consumption — more output from the same furnace footprint.

The Result

36 → 42–45 tons/hr.

Want a similar outcome in your plant? Talk to Encon about combustion, furnace, oven, heat recovery or energy-saving solutions engineered around your operating reality.